Village of Plandome Building Permits
Get your permit filed or your violation fixed. Free quote.
Plandome is a village in the Town of North Hempstead, and permits go to the Village. The Village's rule: approved work must start within 90 days and be done within nine months.
Village of Plandome Building Department (not us)
- Address
- Village Hall, 65 South Drive (P.O. Box 930), Plandome, NY 11030
- Phone
- 516-627-1733 or 516-627-1748 (Village Hall)
- Hours
- Clerk's Office Monday–Friday, 8am–4pm (summer Fridays 8am–12pm).
- Permit portal
- None. Applications are filled out in duplicate on the Village's PDF forms and filed on paper.
- Local code
- Code of the Village of Plandome
- Forms
- Codes & forms
How Filing Works in Plandome
- Zoning firstTwo applications and two preliminary drawing sets go in for a zoning check.
- DRBEight drawing sets, photos of your house and both neighbors, and material samples.
- Permit setTwo sealed plan sets, two surveys and two county assessor's forms.
- InspectionsGive at least 24 hours notice for every inspection.

Selling your house? Close your open permits first.
How We Help in Plandome
- All three stages. We take your job from the zoning check through the DRB to the final permit set.
- Beating the clock. We plan so work starts within 90 days, and we ask for any extension before the permit lapses.
- Need a variance? We refer you to a zoning/land-use attorney and keep the permit moving.
Decks, fences, sheds and pools: about 2–4 weeks. Other jobs: about 4–8 weeks on average.* It varies by village and scope.*Typical time is based on an average job in the Village of Plandome, assuming no extra work or construction needs to be done and the building department accepts the permit application.

Plandome Permit Questions
Which form do I use?
The short form covers plumbing and small jobs, including generators and most accessory structures. The long form covers new buildings, additions, alterations, fences, decks, driveways, patios, demolition, pools, retaining walls and fill over 50 cubic yards. The long form requires a Design Review Board meeting.
Source: Village of Plandome: Codes & Forms (opens in a new tab)
Does a repair need a permit?
Maybe. The Building Inspector says a permit is not required for maintenance, but a permit may be required for a repair. Generators need a permit and cannot go in the front yard.
Source: Village of Plandome: Building Inspector Field Notes (opens in a new tab)
What does the Design Review Board need?
Eight full sets of drawings at quarter-inch scale, photos of the house and of the neighboring houses on each side, and material samples. The Village says review takes 4–6 weeks, but not more than 62 days, from a complete submission.
Source: Village of Plandome: Building Permit & Energy Code Guidelines (opens in a new tab)
How long is a Plandome permit good for?
Work must substantially start within 90 days of the permit and be finished within nine months. The permit expires without notice, so ask for an extension before it runs out.
Source: Village of Plandome: Building Permit Long Form (opens in a new tab)
What is needed before the CO?
An electrical underwriters certificate, a final survey and an energy code certification from a licensed engineer or architect.
Source: Village of Plandome: Building Permit Long Form (opens in a new tab)
Can I take down a tree?
Trees 10 inches or more in diameter need a permit. Mark each tree with a ribbon and include an arborist report. The Village rates each tree, and a denial can be appealed to the Zoning Board of Appeals.

Hours
- Monday
- 8:30am–8:30pm
- Tuesday
- 8:30am–8:30pm
- Wednesday
- 8:30am–8:30pm
- Thursday
- 8:30am–8:30pm
- Friday
- 8:30am–8:30pm
- Saturday
- Closed
- Sunday
- Closed
After-hours and weekend messages are answered the next business day.
Prefer to talk? Call or text 516-399-0139.